Plumber before pouring

Before your slab can be poured the concreter needs to work with the plumber to pre-lay all the pipework. This means that when it comes to plumbing everything down the track pipes is in place ready to be connected.  

We can then pour your footings and floor slab. 

Action shot from the #condondriveproject